Mục lục
INDEX
Content
Page
Part A: Technique and progress content
4
Execution method explanation
4
Introduction
4
Preparation work
4
Arrange plan
6
Execution method
7
Foundation execution method
7
Concrete execution method for body part
9
Execution of wall, concrete, steel, pit floor
9
Reinforcement assembling
9
Contruction
17
Completion methods for finishing work
19
Plaster
19
Pressing and plastering work
19
Painting work
20
Glazing execution
21
Door installation
21
Electricity, thunder proctection
22
Drainage and supply water system
23
Damp-roof work
23
Construction execution progress and construction progress guarantee
24
Guarantee method of construction quality
25
General explanation
25
The explanation about material and machine supply . Contractor will appply works standard guarantee quality acccording to design
25
Main materials
25
Equipments
25
Human resource arrangment
26
Technical supervisors
26
Technical engineers and workers in work
26
Workers
26
Equipments for execution
26
Execution arrangment
27
Acceptance
27
Material supply
27
List of main materials used in construction
28
Technical method to guarantee work quality
29
Reinforcement
29
Concrete execution
29
Formwork excution
30
Construction
30
Apply progressive science and techonology in construction
30
List of main machine and equipment in construction execution
31
Maintenace commiment
32
Part B: Fire fighting method, safety-insurance bid environental hygiene safely for surrounding work
33
Fire fighting method, safety-insurance bid environental hygiene safely for surrounding work
33
General explanation
33
Safety –insurance for worker, risk of contractor
33
Material safety, equipment
34
Security
34
Environment sanitation
34
Fire ,earthquake, flood and storm prevention method
34
Safety for surrounding work
35
Part C: Conclusion
35
Part D: Drawing
36
INDEX
Content
Page
Part A: Technique and progress content
4
A.I
4
A.I.1
4
A.I.2
4
A.I.3
6
A.I.4
7
A.I.4.1
7
A.I.4.2
9
1
9
2
9
3
17
A.I.4.3
19
1
19
2
19
3
20
4
21
5
21
6
22
7
23
8
23
A.II
24
A.III
25
A.III.1
25
A.III.2
25
1
25
2
25
A.III.3
26
1
26
2
26
3
26
A.III.4
26
A.III.5
27
A.III.6
27
A.III.7
27
A.III.8
28
A.III.9
29
1
29
2
29
3
30
4
30
A.III.10
30
A.III.11
31
A.IV
32
Part B: Fire fighting method, safety-insurance bid environental hygiene safely for surrounding work
33
B.I
33
B.I.1
33
B.I.2
33
B.I.3
34
B.I.4
34
B.I.5
34
B.I.6
34
B.II
35
Part C: Conclusion
35
Part D: Drawing
36