Trích dẫn:
Wage rates vary greatly with the locations of projects. In addition to paying the base rates, an employer must pay or contribute additional amounts for such items as Social Security taxes, Workmen's Compensation Insurance, Unemployment Compensation Taxes, and possibly others, the costs of which may vary considerably. Similar costs and variations may apply to all labor trades and locations. An estimator must determine the effective total wage cost for each trade or classification that will be employed on any given project.
The wage rates for work done in excess of 8 hr per day, or 40 hours per week, or on Saturdays, Sundays, and holidays will be increased, generally to 1.5 or 2 times the basic scale.
Sometimes the rates will be lower for work performed outside urban areas, or for work performed on heavy condition.
In general, the national average basic wage rates will be used to determine the costs. The effect of fringe benefits, taxes, and insurance will not be included in the rates.
> Translate into VietNamese!
Mức lương sẽ thay đổi đáng kể theo khu vực thực hiện dự án. Ngoài việc phải chi trả mức lương cơ bản ra thì chủ sử dụng phải thanh toán hay đóng góp những khoản bổ sung như