Các bạn giúp mình đoạn sau - The contractor provide tower crane, hoist, concrete placing boom and pump cars, external scaffolding, electric and water for construction - The sheet pile for foundation construction shall be withdrawn after casting concrete. - This amount not include temporary access road construction, only include maintaining cost. - For QA, QC procedure, this amount not include material and testing fee. - This amount include a 500KVA standby generator. - The Preliminary amount of Hotel for 23 months, of Residential tower for 17 month and Podium for 12 months of operation - The Preliminary amount of Podium shall be reduced in case the quantities reduced. - Materials provided by sub-contractor: + Steel reinforcement work:Tying wire, chairs bars except mat foundation, bar bending & cutting machine with jig + Formworks: General form tie, timber with nails for timber and concrete. Podium: Contractor provide plywood. Sub-contractor provides all system support. Hotel and residential tower: The contractor provide all plywood, system support, prop. + Concrete casting works: Vibrator with heads(including fuel), hessian cloths for curing, PE film. + General: Light/medium duty scaffoldings and supports, lighting for night time working, hand tools, water stop, safety gears, surveing tools.