Hove City Park 600 tonnes of Westok beams used for massive service integration requirements. Fabricator: Graham Wood Structural Engineer: Archibald Shaw Span: 11m span Beam: 568mm deep The engineer also used 15m span Westok floor beams for a 2 level office and mezzanine. Five elongated web-openings 1200 x 400mm in each beam, some stiffened and some unstiffened (foc). Fabricator: Bone Steel Ltd Engineer: Buro Happold Span: Up to 14m spans Beam: 530mm deep typically