Thảo luận về Quo của dự án

phamquang1508

Thành viên sắp lên hạng Rất năng động
Tham gia
28/2/08
Bài viết
90
Điểm thành tích
18
Tuổi
40
Các bạn giúp mình đoạn sau - The contractor provide tower crane, hoist, concrete placing boom and pump cars, external scaffolding, electric and water for construction - The sheet pile for foundation construction shall be withdrawn after casting concrete. - This amount not include temporary access road construction, only include maintaining cost. - For QA, QC procedure, this amount not include material and testing fee. - This amount include a 500KVA standby generator. - The Preliminary amount of Hotel for 23 months, of Residential tower for 17 month and Podium for 12 months of operation - The Preliminary amount of Podium shall be reduced in case the quantities reduced. - Materials provided by sub-contractor: + Steel reinforcement work:Tying wire, chairs bars except mat foundation, bar bending & cutting machine with jig + Formworks: General form tie, timber with nails for timber and concrete. Podium: Contractor provide plywood. Sub-contractor provides all system support. Hotel and residential tower: The contractor provide all plywood, system support, prop. + Concrete casting works: Vibrator with heads(including fuel), hessian cloths for curing, PE film. + General: Light/medium duty scaffoldings and supports, lighting for night time working, hand tools, water stop, safety gears, surveing tools.
 

Tải bộ cài phần mềm Dự toán GXD, Đấu thầu GXD, Thanh Quyết toán GXD, Quản lý chất lượng GXD. Dành cho người mua bản quyền
Kích để xem khóa học Dự toán công trình
Kích để xem khóa học Dự toán công trình
Phần mềm quản lý chất lượng công trình QLCL GXD
Tìm hiểu khóa học Thanh Quyết toán GXD

Các bài viết mới

Top